Cape Cod Project is a natural gas pipeline lateral in Massachusetts, operated by Algonquin Gas Transmission, LLC. Construction began in 2007.
| Cape Cod Project | |
|---|---|
| Also called | Algonquin Cape Cod Lateral[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2][3] |
| Status | In service[2][4] |
| Commodity | Natural gas[2][3] |
| Owner and operator | |
| State | Massachusetts[1][2][3] |
| Approved | 22 September 2006[1][3] |
| Construction started | 13 March 2007[5] |
| In service | December 2007[2] or 20 November 2007[4][sources disagree] |
| FERC docket | CP06-143[1] |
| Technical information | |
| Length | 3.5 mi[1][3] or 3.8 mi[2][sources disagree] |
| Pipe size | 18"[2][3] |
| Capacity | 38 MMcf/d (FERC project list)[1][2] or up to 38,000 Dth/d[3][sources disagree] |
| Cost | $15 million (EIA estimate; no dollar year given)[2] or $15,953,619[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Cape Cod Project is a natural gas pipeline lateral in Massachusetts, operated by Algonquin Gas Transmission, LLC. Construction began in 2007.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Cost | |
| In service | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Cape Cod Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order issuing certificate, Algonquin Gas Transmission (Cape Cod Project, CP06-143)”. Federal Energy Regulatory Commission. 22 September 2006. Retrieved 4 October 2026.
- “Notice that the Cape Cod Lateral and appurtenant facilities were placed in service 11/20/07 (CP06-143)”. Federal Energy Regulatory Commission. 20 November 2007. Retrieved 4 October 2026.
- “Notification that construction-related activities for the Cape Cod Project commenced 3/13/07 (CP06-143)”. Federal Energy Regulatory Commission. 21 March 2007. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.