Capital Area Project is a natural gas pipeline expansion, operated by Eastern Gas Transmission and Storage, Inc..

Capital Area Project
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusProposed[2] or Under construction[3][sources disagree]
CommodityNatural gas[2]
Owners and operators
Facility projects
StatesPA, VA[4][5] or MD, PA, VA[2][sources disagree]
CountiesPennsylvania: Centre, Clinton, Franklin
Virginia: Loudoun
[6]
Approved20 November 2025[4][6]
FERC docketCP25-29[1]
Technical information
Capacity67.5 MMcf/d (FERC project list)[4][5] or 68 MMcf/d additional capacity (EIA)[2][sources disagree]
Units added1 (gas-fired turbine, 6,130 hp each); 1 (gas-fired turbine, 11,110 hp each); 1 (electric motor, 5,000 hp each)[6]
Costapproximately $171 million[6]
On ProvenHand
Hands listed0

Capital Area Project is a natural gas pipeline expansion, operated by Eastern Gas Transmission and Storage, Inc..

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 67.5 MMcf/d (FERC project list)[4][5]
  • 68 MMcf/d additional capacity (EIA)[2]
Status
  • Proposed[2]
  • Under construction[3]
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Capital Area Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP25-29”. Federal Energy Regulatory Commission. 11 December 2024. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Monthly Construction Status Report (period beginning 08/01/2026), Capital Area Project (CP25-29)”. Eastern Gas Transmission and Storage, Inc. (filed with FERC). 25 September 2026. Retrieved 3 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
  6. “Order Issuing Certificate, Eastern Gas Transmission and Storage, Inc., Capital Area Project (CP25-29)”. Federal Energy Regulatory Commission. 20 November 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.