Carlsbad Gateway Lea County Expansion Project
From the ProvenHand pipeline wiki
Carlsbad Gateway Lea County Expansion Project is a natural gas pipeline expansion in New Mexico and Texas, operated by Carlsbad Gateway, LLC. Construction began in 2024. It runs 20 miles of 20" pipe.
| Carlsbad Gateway Lea County Expansion Project | |
|---|---|
| Also called | Lea County Expansion Project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| States | New Mexico, Texas[3] |
| Counties | New Mexico: Lea Texas: Loving[3] |
| Construction started | 9 August 2024[4] |
| FERC docket | CP24-200[1] |
| Technical information | |
| Length | 20 mi[3] |
| Pipe size | 20"[3] |
| Cost | $35,000,000 (cost stated in FERC staff EA)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Carlsbad Gateway Lea County Expansion Project is a natural gas pipeline expansion in New Mexico and Texas, operated by Carlsbad Gateway, LLC. Construction began in 2024. It runs 20 miles of 20" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Carlsbad Gateway Lea County Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP24-200”. Federal Energy Regulatory Commission. 19 April 2024. Retrieved 3 October 2026.
- “Quarterly Construction Status Report (November 25, 2024 to February 23, 2025), Lea County Expansion Project (CP24-200)”. Carlsbad Gateway, LLC (filed with FERC). 27 February 2025. Retrieved 3 October 2026.
- “Environmental Assessment Report, Lea County Expansion Project (CP24-200)”. FERC. 28 June 2024. Retrieved 3 October 2026.
- “Weekly Construction Status Report (August 5 to 11, 2024), Lea County Expansion Project (CP24-200)”. Carlsbad Gateway, LLC (filed with FERC). 15 August 2024. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.