Carlsbad South Project
From the ProvenHand pipeline wiki
Carlsbad South Project is a natural gas pipeline expansion in New Mexico and Texas, operated by El Paso Natural Gas Company, L.L.C.. It entered service in 2021. It runs 17.1 miles of 16" pipe.
| Carlsbad South Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| States | New Mexico, Texas[1][3] |
| Counties | Eddy, Lea[3] |
| In service | 28 February 2021[1] |
| FERC docket | CP20-483[1] |
| Technical information | |
| Length | 17.1 mi[1][3] |
| Pipe size | 16"[1][3] |
| Capacity | 159 MMcf/d additional capacity (EIA)[1] |
| Cost | $23.5 million (EIA estimate; no dollar year given)[1][3] |
| On ProvenHand | |
| Hands listed | 0 |
Carlsbad South Project is a natural gas pipeline expansion in New Mexico and Texas, operated by El Paso Natural Gas Company, L.L.C.. It entered service in 2021. It runs 17.1 miles of 16" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Carlsbad South Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP20-483”. Federal Energy Regulatory Commission. 19 June 2020. Retrieved 3 October 2026.
- “Notice of Request under Blanket Authorization, El Paso Natural Gas Company, L.L.C., Carlsbad South Project (CP20-483)”. FERC (public notice, eLibrary). 24 June 2020. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.