Carnation Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Carnation Project is a natural gas pipeline expansion in Ohio, operated by Texas Gas Transmission, LLC.

Carnation Project
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusProposed[2] or Approved[3][sources disagree]
CommodityNatural gas[2]
Owner and operator
StateOhio[2][4]
CountiesHamilton[3]
Approved10 September 2026[3][4]
FERC docketCP26-16[1]
Technical information
Capacity170 MMcf/d (FERC project list)[2][4]
Units added1 × Solar Mars 100 (gas turbine, 14,189 hp each)[3]
Horsepower added14,189 hp[3]
Costapproximately $67.5 million[3]
On ProvenHand
Hands listed0

Carnation Project is a natural gas pipeline expansion in Ohio, operated by Texas Gas Transmission, LLC.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Status

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Carnation Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-16”. Federal Energy Regulatory Commission. 31 October 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, Texas Gas Transmission, LLC, Carnation Project (CP26-16)”. Federal Energy Regulatory Commission. 10 September 2026. Retrieved 3 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.