Carthage to Perryville Project is a natural gas pipeline in Louisiana and Texas, operated by Centerpoint Energy Gas Transmission.

Carthage to Perryville Project
Also calledCEGT Perryville Expansion Phase I & 2[1]
General information
KindPipeline project[1]
Project typeNew build[2]
StatusIn service[2][3]
CommodityNatural gas[2]
Owner and operator
StatesLouisiana, Texas[1][2]
Approved2 October 2006[1][4]
In service5 February 2008[2] or 1 May 2007[3][sources disagree]
FERC docketCP06-85[1]
FERC pre-filing docketPF06-1[1]
Contractors
Technical information
Length171.9 mi[1] or 172 mi[2][3][sources disagree]
Pipe size42"[2][3]
Capacity1237 MMcf/d (FERC project list)[1][2]
Cost$425 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Carthage to Perryville Project is a natural gas pipeline in Louisiana and Texas, operated by Centerpoint Energy Gas Transmission.

Contractorsedit

ContractorWorkScopeSpreadYears
Associated Pipe Line Contractors, Inc.[5]PrimeLine CP Spread 2 (location given as Bossier City, LA): about 29.5 miles of 42-inch pipelineSpread 21 November 2006 – 1 February 2007

Spreads

SpreadPrime contractor
Spread 2[5]Associated Pipe Line Contractors, Inc.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 5 February 2008[2]
  • 1 May 2007[3]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Carthage to Perryville Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “CenterPoint Energy Resources Corp. Form 10-Q for the quarter ended September 30, 2007 (Carthage to Perryville)”. CenterPoint Energy Resources Corp. (SEC filing). 7 November 2007. Retrieved 4 October 2026.
  4. “Order Issuing Certificate, CenterPoint Energy Gas Transmission Company (CP06-85), eLibrary filing description”. FERC. 2 October 2006. Retrieved 4 October 2026.
  5. “Major pipeline projects executed by Associated Pipe Line Contractors, Inc. (Wayback capture 2009-05-02)”. Associated Pipe Line Contractors, Inc. Archived from the original on 2 May 2009. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.