Carthage to Perryville Proj/Phase III Exp
From the ProvenHand pipeline wiki
Carthage to Perryville Proj/Phase III Exp is a natural gas pipeline expansion in Louisiana and Texas, operated by Centerpoint Energy Gas Transmission. It entered service in 2008.
| Carthage to Perryville Proj/Phase III Exp | |
|---|---|
| Also called | CEGT Perryville Expansion Phase 3[1], Carthage to Carryville Project[2] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[3] |
| Status | In service[3] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| States | Louisiana, Texas[1][3][4] |
| Counties | Louisiana: Red River Texas: Panola[4] |
| Approved | 17 May 2007[1][5] |
| In service | 2 May 2008[3] |
| FERC docket | CP07-41[1] |
| Technical information | |
| Capacity | 280 MMcf/d (FERC project list)[1] or 316 MMcf/d additional capacity (EIA)[3][sources disagree] |
| Capacity added | increase the capacity of the line by an additional 280,000 Dth/d[4] |
| Horsepower added | 30,000 hp[4] |
| Cost | $41.3 million (EIA estimate; no dollar year given)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Carthage to Perryville Proj/Phase III Exp is a natural gas pipeline expansion in Louisiana and Texas, operated by Centerpoint Energy Gas Transmission. It entered service in 2008.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Carthage to Perryville Proj/Phase III Exp? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC eLibrary docket CP07-41”. Federal Energy Regulatory Commission. 3 November 2006. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Application, CenterPoint Energy Gas Transmission Company, Line CP Phase III expansion (CP07-41 and CP06-85-002)”. FERC (public notice, eLibrary). 21 December 2006. Retrieved 4 October 2026.
- “Order amending certificate and issuing certificate, CenterPoint Energy Gas Transmission Co (CP07-41 et al.)”. FERC (eLibrary filing description). 17 May 2007. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.