Casey Creek Project
From the ProvenHand pipeline wiki
Casey Creek Project is a pipeline replacement in Kentucky, operated by Columbia Gulf Transmission, LLC. Construction began in 2026. It runs 0.5 miles of 30" pipe.
| Casey Creek Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Status | Under construction[2] |
| Owner and operator | |
| State | Kentucky[3] |
| Counties | Adair[3] |
| Approved | 24 February 2026[4] |
| Construction started | March 2026[5] |
| FERC docket | CP26-47[1] |
| Technical information | |
| Length | 0.5 mi[3] |
| Pipe size | 30"[3] |
| Cost | $22,000,000 (cost stated in FERC staff EA)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Casey Creek Project is a pipeline replacement in Kentucky, operated by Columbia Gulf Transmission, LLC. Construction began in 2026. It runs 0.5 miles of 30" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Casey Creek Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-47”. Federal Energy Regulatory Commission. 18 December 2025. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 31 (September 22 to 28, 2026), Casey Creek Project (CP26-47)”. Columbia Gulf Transmission, LLC (filed with FERC). 1 October 2026. Retrieved 4 October 2026.
- “Environmental Assessment Report, Casey Creek Project (CP26-47)”. FERC. 19 February 2026. Retrieved 4 October 2026.
- “Weekly Construction Status Report No. 1 (February 24 to March 2, 2026), Casey Creek Project (CP26-47)”. Columbia Gulf Transmission, LLC (filed with FERC). 12 March 2026. Retrieved 4 October 2026.
- “Weekly Construction Status Report No. 5 (March 24 to 30, 2026), Casey Creek Project (CP26-47)”. Columbia Gulf Transmission, LLC (filed with FERC). 2 April 2026. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.