Cedar Springs Class Replacement Project is a natural gas pipeline replacement in Virginia, operated by Columbia Gas Transmission, LLC. Construction began in 2023.
| Cedar Springs Class Replacement Project | |
|---|---|
| Also called | Lines VB, VB-Loop, and VB-5 Cedar Springs Class Replacement Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Replacement[1] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Virginia[1] |
| Counties | Shenandoah[1] |
| Construction started | March 2023[3] |
| FERC docket | CP23-32[2] |
| Technical information | |
| Cost | approximately $33,400,000[1] |
| On ProvenHand | |
| Hands listed | 0 |
Cedar Springs Class Replacement Project is a natural gas pipeline replacement in Virginia, operated by Columbia Gas Transmission, LLC. Construction began in 2023.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Cedar Springs Class Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Notice of Request Under Blanket Authorization, Columbia Gas Transmission, LLC (CP23-32)”. Federal Energy Regulatory Commission. 30 December 2022. Retrieved 4 October 2026.
- “FERC eLibrary docket CP23-32”. Federal Energy Regulatory Commission. 21 December 2022. Retrieved 3 October 2026.
- “Final Weekly Construction Status Report No. 43, Lines VB, VB-Loop, and VB-5 Cedar Springs Class Replacement Project (CP23-32)”. Columbia Gas Transmission, LLC (filed with FERC). 2 January 2024. Retrieved 4 October 2026.