CEGT Cove Compressor Station Project is a natural gas pipeline expansion in Arkansas, operated by Centerpoint Energy Gas Transmission. It entered service in 2008.

CEGT Cove Compressor Station Project
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
StateArkansas[1]
CountiesPolk[3]
Approved16 November 2007[4]
In serviceNovember 2008[1]
FERC docketCP07-437[1]
Technical information
Capacity200 MMcf/d additional capacity (EIA)[1]
Units added1 × Solar Mars 100/C652 (turbine-driven centrifugal compressor package)[3]
Horsepower added14,801 hp[3]
Cost$26.26 million (EIA estimate; no dollar year given)[1] or approximately $26,257,504 (CenterPoint estimate)[3][sources disagree]
On ProvenHand
Hands listed0

CEGT Cove Compressor Station Project is a natural gas pipeline expansion in Arkansas, operated by Centerpoint Energy Gas Transmission. It entered service in 2008.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $26.26 million (EIA estimate; no dollar year given)[1]
  • approximately $26,257,504 (CenterPoint estimate)[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on CEGT Cove Compressor Station Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP07-437”. Federal Energy Regulatory Commission. 15 August 2007. Retrieved 3 October 2026.
  3. “Centerpoint Energy Gas Transmission Company; Notice of Request Under Blanket Authorization (Docket No. CP07-437-000), Federal Register E7-17547”. Federal Energy Regulatory Commission (published in the Federal Register). 6 September 2007. Retrieved 4 October 2026.
  4. “Order denying protests and authorizing construction and operation of facilities under blanket certificate, CenterPoint Energy Gas Transmission Co (CP07-437)”. Federal Energy Regulatory Commission (order). 16 November 2007. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.