CEGT Elm Grove Supply Expansion

From the ProvenHand pipeline wiki

CEGT Elm Grove Supply Expansion is a natural gas pipeline expansion in Louisiana, operated by Centerpoint Energy Gas Transmission. It entered service in 2007. It runs 17.5 miles of 12" pipe.

CEGT Elm Grove Supply Expansion
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
StateLouisiana[1]
Announced1 May 2006[3]
In service15 February 2007[1]
FERC docketCP06-168[1]
Technical information
Length17.5 mi[1]
Pipe size12"[1]
Capacity140 MMcf/d additional capacity (EIA)[1]
Cost$18.08 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

CEGT Elm Grove Supply Expansion is a natural gas pipeline expansion in Louisiana, operated by Centerpoint Energy Gas Transmission. It entered service in 2007. It runs 17.5 miles of 12" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on CEGT Elm Grove Supply Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP06-168”. Federal Energy Regulatory Commission. 1 May 2006. Retrieved 3 October 2026.
  3. “Request to abandon in place, replace and extend an existing supply lateral and construct a new compressor station, Elm Grove Supply (CP06-168)”. CenterPoint Energy Gas Transmission Company (filed with FERC). 1 May 2006. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.