CEGT Harrison Supply Lateral Expansion

From the ProvenHand pipeline wiki

CEGT Harrison Supply Lateral Expansion is a natural gas pipeline lateral in Texas, operated by Centerpoint Energy Gas Transmission. It entered service in 2007. It runs 14.4 miles of 16" pipe.

CEGT Harrison Supply Lateral Expansion
General information
KindPipeline project[1]
Project typeLateral[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StateTexas[1]
In service15 March 2007[1]
Technical information
Length14.4 mi[1]
Pipe size16"[1]
Capacity60 MMcf/d additional capacity (EIA)[1]
Cost$12.7 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

CEGT Harrison Supply Lateral Expansion is a natural gas pipeline lateral in Texas, operated by Centerpoint Energy Gas Transmission. It entered service in 2007. It runs 14.4 miles of 16" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on CEGT Harrison Supply Lateral Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.