CEGT Harrison Supply Lateral Expansion
From the ProvenHand pipeline wiki
CEGT Harrison Supply Lateral Expansion is a natural gas pipeline lateral in Texas, operated by Centerpoint Energy Gas Transmission. It entered service in 2007. It runs 14.4 miles of 16" pipe.
| CEGT Harrison Supply Lateral Expansion | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Texas[1] |
| In service | 15 March 2007[1] |
| Technical information | |
| Length | 14.4 mi[1] |
| Pipe size | 16"[1] |
| Capacity | 60 MMcf/d additional capacity (EIA)[1] |
| Cost | $12.7 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
CEGT Harrison Supply Lateral Expansion is a natural gas pipeline lateral in Texas, operated by Centerpoint Energy Gas Transmission. It entered service in 2007. It runs 14.4 miles of 16" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on CEGT Harrison Supply Lateral Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.