CEGT Line2-AD-24 Childes Lateral

From the ProvenHand pipeline wiki

CEGT Line2-AD-24 Childes Lateral is a natural gas pipeline lateral in Oklahoma, operated by Centerpoint Energy Gas Transmission. It entered service in 2005. It runs 24 miles of 16", 20", 24" pipe.

CEGT Line2-AD-24 Childes Lateral
Also calledChiles Dome Expansion Project[1]
General information
KindPipeline project[2]
Project typeLateral[2]
StatusIn service[1][2]
CommodityNatural gas[2]
Owner and operator
StateOklahoma[2]
Approved25 July 2005[4]
In service14 December 2005[2]
FERC docketCP05-58[2]
Technical information
Length24 mi[2]
Pipe size16", 20", 24"[2]
Capacity400 MMcf/d additional capacity (EIA)[2]
Cost$3.5 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

CEGT Line2-AD-24 Childes Lateral is a natural gas pipeline lateral in Oklahoma, operated by Centerpoint Energy Gas Transmission. It entered service in 2005. It runs 24 miles of 16", 20", 24" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on CEGT Line2-AD-24 Childes Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “CenterPoint Energy Gas Transmission notice that Line 2-AD-24 was placed into service for the Chiles Dome Expansion Project (CP05-58)”. CenterPoint Energy Gas Transmission Company (filed with FERC). 10 February 2006. Retrieved 4 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP05-58”. Federal Energy Regulatory Commission. 26 January 2005. Retrieved 3 October 2026.
  4. “Order Issuing Certificate, CenterPoint Energy Gas Transmission Company (CP05-58)”. FERC. 25 July 2005. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.