CEGT Line2-AD-24 Childes Lateral
From the ProvenHand pipeline wiki
CEGT Line2-AD-24 Childes Lateral is a natural gas pipeline lateral in Oklahoma, operated by Centerpoint Energy Gas Transmission. It entered service in 2005. It runs 24 miles of 16", 20", 24" pipe.
| CEGT Line2-AD-24 Childes Lateral | |
|---|---|
| Also called | Chiles Dome Expansion Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Lateral[2] |
| Status | In service[1][2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Oklahoma[2] |
| Approved | 25 July 2005[4] |
| In service | 14 December 2005[2] |
| FERC docket | CP05-58[2] |
| Technical information | |
| Length | 24 mi[2] |
| Pipe size | 16", 20", 24"[2] |
| Capacity | 400 MMcf/d additional capacity (EIA)[2] |
| Cost | $3.5 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
CEGT Line2-AD-24 Childes Lateral is a natural gas pipeline lateral in Oklahoma, operated by Centerpoint Energy Gas Transmission. It entered service in 2005. It runs 24 miles of 16", 20", 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on CEGT Line2-AD-24 Childes Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “CenterPoint Energy Gas Transmission notice that Line 2-AD-24 was placed into service for the Chiles Dome Expansion Project (CP05-58)”. CenterPoint Energy Gas Transmission Company (filed with FERC). 10 February 2006. Retrieved 4 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP05-58”. Federal Energy Regulatory Commission. 26 January 2005. Retrieved 3 October 2026.
- “Order Issuing Certificate, CenterPoint Energy Gas Transmission Company (CP05-58)”. FERC. 25 July 2005. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.