CEGT Long Lake Compressor Station Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

CEGT Long Lake Compressor Station Project is a natural gas pipeline expansion in Louisiana, operated by Centerpoint Energy Gas Transmission. It entered service in 2009. It runs 0.5 miles of 16" pipe.

CEGT Long Lake Compressor Station Project
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
StateLouisiana[1]
CountiesRed River[3]
In service30 June 2009[1]
FERC docketCP08-455[1]
Technical information
Length0.5 mi[1][3]
Pipe size16"[3]
Capacity90 MMcf/d additional capacity (EIA)[1]
Units added1 × Waukesha L7044GSI (rental compressor, 1,680 hp each)[3]
Horsepower added1,680 hp[3]
Cost$10 million (EIA estimate; no dollar year given)[1] or $10.018 million (CenterPoint estimate)[3][sources disagree]
On ProvenHand
Hands listed0

CEGT Long Lake Compressor Station Project is a natural gas pipeline expansion in Louisiana, operated by Centerpoint Energy Gas Transmission. It entered service in 2009. It runs 0.5 miles of 16" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $10 million (EIA estimate; no dollar year given)[1]
  • $10.018 million (CenterPoint estimate)[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on CEGT Long Lake Compressor Station Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP08-455”. Federal Energy Regulatory Commission. 1 August 2008. Retrieved 3 October 2026.
  3. “CenterPoint Energy Gas Transmission Company; Notice of Request Under Blanket Authorization (Docket No. CP08-455-000), Federal Register E8-18734”. Federal Energy Regulatory Commission (published in the Federal Register). 13 August 2008. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.