CEGT Replacement Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

CEGT Replacement Project is a natural gas pipeline in Arkansas, operated by Centerpoint Energy Gas Transmission. It entered service in 2008. It runs 25 miles of 24" pipe.

CEGT Replacement Project
Also calledLine E Replacement[1]
General information
KindPipeline project[2]
Project typeExpansion[2] or Replacement[3][sources disagree]
StatusIn service[2]
CommodityNatural gas[2]
Operator
Owner and operator
StateArkansas[2]
CountiesOuachita, Union[1]
In serviceMarch 2008[2]
FERC docketCP07-404[2]
Technical information
Length25 mi[2]
Pipe size24"[2]
Cost$17.7 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

CEGT Replacement Project is a natural gas pipeline in Arkansas, operated by Centerpoint Energy Gas Transmission. It entered service in 2008. It runs 25 miles of 24" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Project type

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on CEGT Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Restoration Summary Report, Line E Replacement prior notice project (CP07-404)”. CenterPoint Energy Gas Transmission Company (filed with FERC). 5 November 2008. Retrieved 4 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP07-404”. Federal Energy Regulatory Commission. 20 June 2007. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.