CEGT Replacement Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
CEGT Replacement Project is a natural gas pipeline in Arkansas, operated by Centerpoint Energy Gas Transmission. It entered service in 2008. It runs 25 miles of 24" pipe.
| CEGT Replacement Project | |
|---|---|
| Also called | Line E Replacement[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[2] or Replacement[3][sources disagree] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Operator | |
| Owner and operator | |
| State | Arkansas[2] |
| Counties | Ouachita, Union[1] |
| In service | March 2008[2] |
| FERC docket | CP07-404[2] |
| Technical information | |
| Length | 25 mi[2] |
| Pipe size | 24"[2] |
| Cost | $17.7 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
CEGT Replacement Project is a natural gas pipeline in Arkansas, operated by Centerpoint Energy Gas Transmission. It entered service in 2008. It runs 25 miles of 24" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on CEGT Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Restoration Summary Report, Line E Replacement prior notice project (CP07-404)”. CenterPoint Energy Gas Transmission Company (filed with FERC). 5 November 2008. Retrieved 4 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP07-404”. Federal Energy Regulatory Commission. 20 June 2007. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.