CenterPoint Energy Gas Transmission CP07-434
From the ProvenHand pipeline wiki
CenterPoint Energy Gas Transmission CP07-434 is a facility project, operated by Centerpoint Energy Gas Transmission. It entered service in 2007.
| CenterPoint Energy Gas Transmission CP07-434 | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Status | In service[2] |
| Owner and operator | |
| Counties | Caddo[3] |
| In service | 1 December 2007[2] |
| FERC docket | CP07-434[1] |
| Technical information | |
| Capacity | capability of delivering up to 10,000 Dth per day[3] |
| Cost | $208,457 (CEGT estimate)[3] |
| On ProvenHand | |
| Hands listed | 0 |
CenterPoint Energy Gas Transmission CP07-434 is a facility project, operated by Centerpoint Energy Gas Transmission. It entered service in 2007.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on CenterPoint Energy Gas Transmission CP07-434? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP07-434”. Federal Energy Regulatory Commission. 10 August 2007. Retrieved 3 October 2026.
- “CenterPoint Energy Gas Transmission submits Notice of Bypass: on 12/1/07 it began delivering natural gas volumes to Calumet Lubricants Co, LP (CP07-434)”. CenterPoint Energy Gas Transmission Company (filed with FERC). 12 December 2007. Retrieved 4 October 2026.
- “CenterPoint Energy Gas Transmission Company; Notice of Request Under Blanket Authorization (Docket No. CP07-434-000), Federal Register E7-16498”. Federal Energy Regulatory Commission (published in the Federal Register). 22 August 2007. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.