Central Columbus North Columbus High Pressure (NCHP) System Project

From the ProvenHand pipeline wiki

Central Columbus North Columbus High Pressure (NCHP) System Project is a natural gas pipeline replacement in Ohio, operated by Columbia Gas of Ohio. It runs 4.2 miles of 20" pipe.

Central Columbus North Columbus High Pressure (NCHP) System Project
Also calledCentral Columbus NCHP Project[1], Central Columbus North High Pressure System Pipeline Project[2]
General information
KindPipeline project[3]
Project typeReplacement[3]
StatusIn service[2]
CommodityNatural gas[3]
Owner and operator
StateOhio[4]
CountiesFranklin[3]
Ohio Power Siting Board case23-0888-GA-BLN[4]
Contractors
Technical information
Length4.2 mi[3]
Pipe size20"[3]
Wall thickness0.375 and 0.5 in[3]
On ProvenHand
Hands listed0

Central Columbus North Columbus High Pressure (NCHP) System Project is a natural gas pipeline replacement in Ohio, operated by Columbia Gas of Ohio. It runs 4.2 miles of 20" pipe.

Contractorsedit

ContractorWorkScope
Campos EPC, LLC[3]environmental review and wetland and waterbody field surveyEnvironmental review of the project area for Columbia, which calls the firm its contractor
Colliers Engineering & Design[3]cultural resource desktop reviewCultural resource desktop review and assessment for the project, done on behalf of Columbia

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Central Columbus North Columbus High Pressure (NCHP) System Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Central Columbus NCHP Project (Columbia Gas of Ohio project page)”. Columbia Gas of Ohio, Inc. Retrieved 3 October 2026.
  2. “PUCO Docketing Information System, case record and docket list for OPSB case 23-0888”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.
  3. “Letter of Notification, Central Columbus North Columbus High Pressure (NCHP) System Project, OPSB Case No. 23-0888-GA-BLN”. Columbia Gas of Ohio, Inc. (filed with the Ohio Power Siting Board; copy on columbiagasohio.com). 29 September 2023. Retrieved 3 October 2026.
  4. “PUCO Docketing Information System: gas cases, purpose BLN”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.