Central Corridor Pipeline Extension

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Central Corridor Pipeline Extension is a natural gas pipeline expansion in Ohio, operated by Duke Energy Ohio. It entered service in 2022.

Central Corridor Pipeline Extension
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StateOhio[1]
Approved21 November 2019[2][3]
In service14 March 2022[1]
Contractors
Technical information
Length12 mi[1] or 14 mi[3][sources disagree]
Pipe size20"[1][4]
Capacity1.032 MMcf/d additional capacity (EIA)[1]
On ProvenHand
Hands listed0

Central Corridor Pipeline Extension is a natural gas pipeline expansion in Ohio, operated by Duke Energy Ohio. It entered service in 2022.

Contractorsedit

ContractorWorkScopeYears
Aaron Enterprises, Inc.[5]HDD and bore17 auger bore, ram and guided-pilot crossings plus three HDD crossings of 20-in steel main in Cincinnatiuntil 1 October 2021
Infrasource[6]PrimeNamed as Duke Energy's contractor for the Central Corridor Pipeline section through Amberley Village, Golf Manor and Cincinnati (railroad bores, then open-trench installation), summer 2021

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Central Corridor Pipeline Extension? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Duke Energy Corporation annual report on Form 10-K for the year ended December 31, 2021”. Duke Energy Corporation (filed with the SEC). 24 February 2022. Retrieved 4 October 2026.
  3. “Ohio Power Siting Board gives Duke Energy Ohio's Central Corridor natural gas pipeline a green light”. Duke Energy (PR Newswire release). 21 November 2019. Retrieved 4 October 2026.
  4. “Duke Energy Ohio modifies design and identifies preferred route for natural gas pipeline”. Duke Energy (news release). Retrieved 4 October 2026.
  5. “Duke Energy Central Corridor (project profile)”. Aaron Enterprises, Inc. Retrieved 3 October 2026.
  6. “Central Corridor Pipeline Construction Advances to Golf Manor in Late July/August”. Village of Golf Manor, Ohio (information provided by Duke Energy). 27 July 2021. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.