Central Virginia Connector Project
From the ProvenHand pipeline wiki
Central Virginia Connector Project is a natural gas pipeline in Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2018. It runs 0.1 miles.
| Central Virginia Connector Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Virginia[1][2] |
| Approved | 6 September 2017[1] |
| In service | 4 September 2018[2] |
| FERC docket | CP16-493[1] |
| Technical information | |
| Length | 0.1 mi[1] |
| Capacity | 45 MMcf/d (FERC project list)[1][2] |
| On ProvenHand | |
| Hands listed | 0 |
Central Virginia Connector Project is a natural gas pipeline in Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2018. It runs 0.1 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Central Virginia Connector Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.