CGT Cobb Expansion Project is a natural gas pipeline expansion in West Virginia, operated by NiSource Gas Transmission & Storage. It entered service in 2010.

CGT Cobb Expansion Project
Also calledCobb Expansion Project[1]
General information
KindPipeline project[2]
Project typeExpansion[2][3]
StatusIn service[1][2]
CommodityNatural gas[2]
Operator
Owner and operator
Facility project
StateWest Virginia[2][4]
CountiesKanawha[4]
In service17 May 2010[1][2]
FERC docketCP09-437[2]
Technical information
Length1 mi[2] or 0.7 mi[4][sources disagree]
Pipe size16"[2][4][5]
Capacity27.6 MMcf/d additional capacity (EIA)[2]
Units added1 (electric motor, 4,500 hp each)[5]
Horsepower added4,500 hp[4]
Cost$16.1 million (EIA estimate; no dollar year given)[2][4][5]
On ProvenHand
Hands listed0

CGT Cobb Expansion Project is a natural gas pipeline expansion in West Virginia, operated by NiSource Gas Transmission & Storage. It entered service in 2010.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on CGT Cobb Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “In-service noise report, Cobb Expansion Project, Columbia Gas Transmission, LLC (CP09-437)”. Columbia Gas Transmission, LLC (filed with FERC). 20 July 2010. Retrieved 4 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP09-437”. Federal Energy Regulatory Commission. 19 June 2009. Retrieved 3 October 2026.
  4. “Notice of request under blanket authorization, Columbia Gas Transmission, LLC (CP09-437)”. FERC. 2 July 2009. Retrieved 4 October 2026.
  5. “Environmental Assessment Report, Cobb Expansion Project (CP09-437)”. FERC. 29 September 2009. Retrieved 4 October 2026.