CGT East Lateral Ryane Expansion
From the ProvenHand pipeline wiki
CGT East Lateral Ryane Expansion is a natural gas pipeline expansion in Louisiana, operated by Columbia Gulf Transmission, LLC. It entered service in 2008.
| CGT East Lateral Ryane Expansion | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | Louisiana[1] |
| Counties | Acadia[3] |
| In service | 20 March 2008[1] |
| FERC docket | CP08-26[1] |
| Technical information | |
| Capacity | 180 MMcf/d additional capacity (EIA)[1] |
| Cost | $17.5 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
CGT East Lateral Ryane Expansion is a natural gas pipeline expansion in Louisiana, operated by Columbia Gulf Transmission, LLC. It entered service in 2008.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on CGT East Lateral Ryane Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP08-26”. Federal Energy Regulatory Commission. 13 November 2007. Retrieved 3 October 2026.
- “Notice of Columbia Gulf Transmission Company's 11/13/07 filing of an application for authorization to construct, own, and operate new natural gas compression facilities located in Acadia Parish, LA (CP08-26), eLibrary filing description”. FERC. 23 November 2007. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.