CGT Eastern Market Expansion is a natural gas pipeline expansion, operated by Columbia Gas Transmission, LLC. It runs 15.3 miles of 26", 36" pipe.

CGT Eastern Market Expansion
Also calledColumbia's Eastern Market Expansion Project[1]
General information
KindPipeline project[2]
Project typeExpansion[1][2]
StatusIn service[2]
CommodityNatural gas[2]
Operator
Owner and operator
StateVA[2] or OH, VA, WV[3][sources disagree]
Approved14 January 2008[4]
In service9 October 2009[2] or 1 April 2009[4][sources disagree]
FERC docketCP07-367[2]
FERC pre-filing docketPF06-35[1]
Technical information
Length15.3 mi[2]
Pipe size26", 36"[2]
Capacity94 MMcf/d additional capacity (EIA)[2]
Capacity added97,000 Dth per day of storage and transportation deliverability (projected)[4]
Cost$142.3 million (EIA estimate; no dollar year given)[2] or $150,142,097 incremental actual cost (estimate $162,851,145); combined project total $201,160,281[5][sources disagree]
On ProvenHand
Hands listed0

CGT Eastern Market Expansion is a natural gas pipeline expansion, operated by Columbia Gas Transmission, LLC. It runs 15.3 miles of 26", 36" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $142.3 million (EIA estimate; no dollar year given)[2]
  • $150,142,097 incremental actual cost (estimate $162,851,145); combined project total $201,160,281[5]
In service
  • 9 October 2009[2]
  • 1 April 2009[4]
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on CGT Eastern Market Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP07-367”. Federal Energy Regulatory Commission. 3 March 2007. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Weekly Construction Status Report No. 47, Eastern Market Expansion Project (CP07-367)”. Columbia Gas Transmission, LLC (filed with FERC). 5 February 2009. Retrieved 4 October 2026.
  4. “NiSource Inc. Form 10-Q for the quarter ended March 31, 2009”. NiSource Inc. (SEC filing). 1 May 2009. Retrieved 4 October 2026.
  5. “Final Cost Report - EME Project (CP07-367)”. Columbia Gas Transmission, LLC (filed with FERC). 17 December 2009. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.