CGT Hardy Storage Pipeline Expansion

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

CGT Hardy Storage Pipeline Expansion is a natural gas pipeline lateral in Maryland, Virginia and West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2007.

CGT Hardy Storage Pipeline Expansion
General information
KindPipeline project[1]
Project typeLateral[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StatesMaryland, Virginia, West Virginia[1][2]
CountiesMaryland: Baltimore
Virginia: Greene, Louisa, Page, Rockingham, Shenandoah

West Virginia: Hardy
[3]
Approved1 November 2005[1][3]
In serviceApril 2007[2]
FERC docketCP05-144[1]
FERC pre-filing docketPF04-14[1]
Technical information
Length33.1 mi[1] or 33.5 mi[2][sources disagree]
Pipe size24"[2][3]
Capacity171.6 MMcf/d (FERC project list)[1] or 175 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$55 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

CGT Hardy Storage Pipeline Expansion is a natural gas pipeline lateral in Maryland, Virginia and West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2007.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 171.6 MMcf/d (FERC project list)[1]
  • 175 MMcf/d additional capacity (EIA)[2]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on CGT Hardy Storage Pipeline Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificates and Authorizing Abandonment, Columbia Gas Transmission and Hardy Storage Company (CP05-144, CP05-151 to CP05-153)”. FERC. 1 November 2005. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.