CGT Hardy Storage Pipeline Expansion
From the ProvenHand pipeline wiki
CGT Hardy Storage Pipeline Expansion is a natural gas pipeline lateral in Maryland, Virginia and West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2007.
| CGT Hardy Storage Pipeline Expansion | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Maryland, Virginia, West Virginia[1][2] |
| Counties | Maryland: Baltimore Virginia: Greene, Louisa, Page, Rockingham, Shenandoah West Virginia: Hardy[3] |
| Approved | 1 November 2005[1][3] |
| In service | April 2007[2] |
| FERC docket | CP05-144[1] |
| FERC pre-filing docket | PF04-14[1] |
| Technical information | |
| Length | 33.1 mi[1] or 33.5 mi[2][sources disagree] |
| Pipe size | 24"[2][3] |
| Capacity | 171.6 MMcf/d (FERC project list)[1] or 175 MMcf/d additional capacity (EIA)[2][sources disagree] |
| Cost | $55 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
CGT Hardy Storage Pipeline Expansion is a natural gas pipeline lateral in Maryland, Virginia and West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2007.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on CGT Hardy Storage Pipeline Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificates and Authorizing Abandonment, Columbia Gas Transmission and Hardy Storage Company (CP05-144, CP05-151 to CP05-153)”. FERC. 1 November 2005. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.