CGT Line 1278 Replacement
From the ProvenHand pipeline wiki
CGT Line 1278 Replacement is a natural gas pipeline expansion in Pennsylvania. It entered service in 2006. It runs 43.4 miles of 20" pipe.
| CGT Line 1278 Replacement | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| State | Pennsylvania[1] |
| In service | 22 November 2006[1] |
| FERC docket | CP04-34[1] |
| Technical information | |
| Length | 43.4 mi[1] |
| Pipe size | 20"[1] |
| Capacity | 8.5 MMcf/d additional capacity (EIA)[1] |
| Cost | $84.5 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
CGT Line 1278 Replacement is a natural gas pipeline expansion in Pennsylvania. It entered service in 2006. It runs 43.4 miles of 20" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on CGT Line 1278 Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.