Chesapeake LNG Vaporizer Replacement
From the ProvenHand pipeline wiki
Chesapeake LNG Vaporizer Replacement is a facility project in Virginia, operated by Columbia Gas Transmission, LLC.
| Chesapeake LNG Vaporizer Replacement | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Rebuild[2] |
| Status | Approved[1] |
| Owner and operator | |
| State | Virginia[3] |
| FERC docket | CP13-22[2] |
| Technical information | |
| Cost | $16,000,000[3] |
| On ProvenHand | |
| Hands listed | 0 |
Chesapeake LNG Vaporizer Replacement is a facility project in Virginia, operated by Columbia Gas Transmission, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Chesapeake LNG Vaporizer Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “30-day advance notification of replacement of vaporizer and appurtenances (Section 2.55(b)), Chesapeake LNG Vaporizer Replacement (CP13-22)”. Columbia Gas Transmission, LLC (filed with FERC). 30 November 2012. Retrieved 4 October 2026.
- “FERC eLibrary docket CP13-22”. Federal Energy Regulatory Commission. 30 November 2012. Retrieved 3 October 2026.
- “Environmental Assessment Report, Chesapeake LNG Vaporizer Replacement (CP13-22)”. FERC. 26 December 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.