Cheyenne Plains 2005 Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Cheyenne Plains 2005 Expansion Project is a natural gas pipeline expansion, operated by Cheyenne Plains Gas Pipeline Co., LLC. It entered service in 2005.

Cheyenne Plains 2005 Expansion Project
Also calledCheyenne Plains Expansion[1]
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateCO[1] or CO, KS[2][sources disagree]
Approved27 September 2004[1]
In service7 November 2005[2]
FERC docketCP04-345[1]
Technical information
Pipe size36"[2]
Capacity170 MMcf/d (FERC project list)[1][2]
Cost$7.8 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Cheyenne Plains 2005 Expansion Project is a natural gas pipeline expansion, operated by Cheyenne Plains Gas Pipeline Co., LLC. It entered service in 2005.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Cheyenne Plains 2005 Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.