Cheyenne Plains Jumper Compressor Project
From the ProvenHand pipeline wiki
Cheyenne Plains Jumper Compressor Project is a natural gas pipeline expansion in Colorado, operated by Colorado Interstate Gas Company, L.L.C.. It entered service in 2004.
| Cheyenne Plains Jumper Compressor Project | |
|---|---|
| Also called | CIG Cheyenne Station Upgrade[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Colorado[1][2] |
| Approved | 24 March 2004[1] |
| In service | December 2004[2] |
| FERC docket | CP03-301[1] |
| Technical information | |
| Capacity | 118.3 MMcf/d (FERC project list)[1] or 120 MMcf/d additional capacity (EIA)[2][sources disagree] |
| Cost | $4.7 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Cheyenne Plains Jumper Compressor Project is a natural gas pipeline expansion in Colorado, operated by Colorado Interstate Gas Company, L.L.C.. It entered service in 2004.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Cheyenne Plains Jumper Compressor Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.