Cheyenne Plains Jumper Compressor Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Cheyenne Plains Jumper Compressor Project is a natural gas pipeline expansion in Colorado, operated by Colorado Interstate Gas Company, L.L.C.. It entered service in 2004.

Cheyenne Plains Jumper Compressor Project
Also calledCIG Cheyenne Station Upgrade[1]
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateColorado[1][2]
Approved24 March 2004[1]
In serviceDecember 2004[2]
FERC docketCP03-301[1]
Technical information
Capacity118.3 MMcf/d (FERC project list)[1] or 120 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$4.7 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Cheyenne Plains Jumper Compressor Project is a natural gas pipeline expansion in Colorado, operated by Colorado Interstate Gas Company, L.L.C.. It entered service in 2004.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 118.3 MMcf/d (FERC project list)[1]
  • 120 MMcf/d additional capacity (EIA)[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Cheyenne Plains Jumper Compressor Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.