CIG 2018 Line Nos. 5A and 5B Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

CIG 2018 Line Nos. 5A and 5B Expansion Project is a natural gas pipeline expansion in Colorado, operated by Colorado Interstate Gas Company, L.L.C.. It was built and entered service in 2018.

CIG 2018 Line Nos. 5A and 5B Expansion Project
Also called2018 Line Nos. 5A and 5B Expansion Project[1]
General information
KindPipeline project[2] or Facility project[3][sources disagree]
Project typeExpansion[1][2]
StatusIn service[2][4]
CommodityNatural gas[2]
Operator
Owner and operator
StateColorado[2]
CountiesWeld[3]
Approved9 May 2018[5]
Construction started29 June 2018[5]
In service9 May 2018[2]
FERC docketCP18-94[2]
Contractors
Technical information
Capacity230 MMcf/d additional capacity (EIA)[2]
Cost$14.5 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

CIG 2018 Line Nos. 5A and 5B Expansion Project is a natural gas pipeline expansion in Colorado, operated by Colorado Interstate Gas Company, L.L.C.. It was built and entered service in 2018.

Contractorsedit

ContractorWorkScope
Bodell Construction[5]PrimeSelected 2018-06-22 as the construction contractor for the project, per the first weekly environmental inspector report

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Kind
  • Pipeline project[2]
  • Facility project[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on CIG 2018 Line Nos. 5A and 5B Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP18-94”. Federal Energy Regulatory Commission. 27 February 2018. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Environmental Assessment Report, CIG 2018 Line Nos. 5A and 5B Expansion Project (CP18-94)”. FERC. 8 May 2018. Retrieved 3 October 2026.
  4. “Weekly Environmental Inspector Report No. 31 (January 20 to 26, 2019), CIG 2018 Line Nos. 5A and 5B Expansion Project (CP18-94)”. Colorado Interstate Gas Company, L.L.C. (filed with FERC). 30 January 2019. Retrieved 3 October 2026.
  5. “Weekly Environmental Inspector Report No. 1 (June 24 to 30, 2018), CIG 2018 Line Nos. 5A and 5B Expansion Project (CP18-94)”. Colorado Interstate Gas Company, L.L.C. (filed with FERC). 5 July 2018. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.