CIG Raton Basin 2002 Expansion
From the ProvenHand pipeline wiki
CIG Raton Basin 2002 Expansion is a natural gas pipeline expansion in Colorado and Oklahoma. It entered service in 2002. It runs 54 miles of 16", 20" pipe.
| CIG Raton Basin 2002 Expansion | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| States | Colorado, Oklahoma[1] |
| In service | 15 December 2002[1] |
| FERC docket | CP02-6[1] |
| Technical information | |
| Length | 54 mi[1] |
| Pipe size | 16", 20"[1] |
| Capacity | 47.3 MMcf/d additional capacity (EIA)[1] |
| Cost | $22.1 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
CIG Raton Basin 2002 Expansion is a natural gas pipeline expansion in Colorado and Oklahoma. It entered service in 2002. It runs 54 miles of 16", 20" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on CIG Raton Basin 2002 Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.