CIG Raton Basin Expansion is a natural gas pipeline expansion, operated by Colorado Interstate Gas Company, L.L.C.. It entered service in 2001.

CIG Raton Basin Expansion
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StatesCO, KS, OK[1] or CO, NM, OK, TX[2][sources disagree]
Approved28 March 2001[1]
In serviceOctober 2001[2]
FERC docketCP00-452[1]
Technical information
Length69 mi[1] or 70 mi[2][sources disagree]
Pipe size20"[2]
Capacity85 MMcf/d (FERC project list)[1] or 83 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$56 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

CIG Raton Basin Expansion is a natural gas pipeline expansion, operated by Colorado Interstate Gas Company, L.L.C.. It entered service in 2001.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 85 MMcf/d (FERC project list)[1]
  • 83 MMcf/d additional capacity (EIA)[2]
Length
States
  • CO, KS, OK[1]
  • CO, NM, OK, TX[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on CIG Raton Basin Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.