CIG Wind River Lateral 97 Expansion
From the ProvenHand pipeline wiki
CIG Wind River Lateral 97 Expansion is a natural gas pipeline expansion in Wyoming. It entered service in 1997.
| CIG Wind River Lateral 97 Expansion | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| State | Wyoming[1] |
| In service | August 1997[1] |
| FERC docket | CP96-289[1] |
| Technical information | |
| Pipe size | 36"[1] |
| Capacity | 40 MMcf/d additional capacity (EIA)[1] |
| Cost | $10.8 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
CIG Wind River Lateral 97 Expansion is a natural gas pipeline expansion in Wyoming. It entered service in 1997.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on CIG Wind River Lateral 97 Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.