City of Jackson Pipeline Replacement Project

From the ProvenHand pipeline wiki

City of Jackson Pipeline Replacement Project is a natural gas pipeline replacement in Mississippi, operated by Gulf South Pipeline Company, LLC. Construction began in 2011 and the line entered service in 2012. It runs 4 miles of 12" pipe.

City of Jackson Pipeline Replacement Project
Also calledCity of Jackson - Index 301 Replacement[1]
General information
KindPipeline project[2]
Project typeReplacement[2][3]
StatusIn service[4]
CommodityNatural gas[3]
Owner and operator
StateMississippi[3][5]
CountiesHinds[3][5]
Construction startedNovember 2011[1]
In service2012[4]
FERC docketCP11-505[2]
Technical information
Length4 mi[3][5]
Pipe size12"[3][5]
Cost$13,509,213[6]
On ProvenHand
Hands listed0

City of Jackson Pipeline Replacement Project is a natural gas pipeline replacement in Mississippi, operated by Gulf South Pipeline Company, LLC. Construction began in 2011 and the line entered service in 2012. It runs 4 miles of 12" pipe.

Crossings

FeatureMethod
Canton Mart Road[1]HDD
Hanging Moss Creek[1]HDD

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on City of Jackson Pipeline Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Gulf South weekly construction progress report, City of Jackson - Index 301 Replacement (CP11-505), filed 2011-12-01”. Gulf South Pipeline Company, LP (filed with FERC). 1 December 2011. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP11-505”. Federal Energy Regulatory Commission. 1 July 2011. Retrieved 3 October 2026.
  3. “Gulf South Pipeline Company, LP; Notice of Request Under Blanket Authorization (Docket No. CP11-505-000), Federal Register 2011-18914”. Federal Energy Regulatory Commission (published in the Federal Register). 27 July 2011. Retrieved 4 October 2026.
  4. “Gulf South final weekly construction progress report, City of Jackson - Index 301 Replacement (CP11-505), filed 2012-10-22”. Gulf South Pipeline Company, LP (filed with FERC). 22 October 2012. Retrieved 4 October 2026.
  5. “FERC notice of request under blanket authorization, City of Jackson Pipeline Replacement Project (CP11-505)”. FERC. 13 July 2011. Retrieved 4 October 2026.
  6. “Environmental Assessment Report, City of Jackson Pipeline Replacement Project (CP11-505)”. FERC. 12 September 2011. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.