Clarington Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Clarington Project is a natural gas pipeline expansion in Ohio and West Virginia, operated by Dominion Transmission, Inc.. It runs 0.2 miles.

Clarington Project
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owners and operators
Facility projects
StatesOhio, West Virginia[1][2][3]
CountiesOhio: Monroe
West Virginia: Marshall
[4]
Approved19 August 2015[1] or 21 November 2024[3][sources disagree]
In service19 October 2016[2] or 1 November 2016[5][sources disagree]
FERC docketCP14-496[1]
West Virginia stormwater permitWVR312340[3]
Technical information
Length0.2 mi[1]
Capacity250 MMcf/d (FERC project list)[1][2]
Cost$77 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Clarington Project is a natural gas pipeline expansion in Ohio and West Virginia, operated by Dominion Transmission, Inc.. It runs 0.2 miles.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Approved
  • 19 August 2015[1]
  • 21 November 2024[3]
In service
  • 19 October 2016[2]
  • 1 November 2016[5]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Clarington Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “WVDEP: Oil and Gas Construction Stormwater registrations”. West Virginia Department of Environmental Protection. Retrieved 3 October 2026.
  4. “Order Issuing Certificate, Clarington Project (CP14-496)”. Federal Energy Regulatory Commission. 19 August 2015. Retrieved 4 October 2026.
  5. “Notification of In-Service, Clarington Project (CP14-496)”. Dominion Transmission, Inc. (filed with FERC). 3 November 2016. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.