Clarksville Gas and Water - Natural Gas Interconnect Pipeline Project
From the ProvenHand pipeline wiki
Clarksville Gas and Water - Natural Gas Interconnect Pipeline Project is a pipeline project in Kentucky and Tennessee, operated by City of Clarksville, Tennessee. It runs 20.8 miles of 12" pipe.
| Clarksville Gas and Water - Natural Gas Interconnect Pipeline Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Owner and operator | |
| States | Kentucky, Tennessee[2] |
| Counties | Kentucky: Todd Tennessee: Montgomery[3] |
| Approved | 9 October 2014[2] |
| FERC docket | CP14-101[2] |
| FERC pre-filing docket | PF13-17[2] |
| Technical information | |
| Length | 20.8 mi[2][4] |
| Pipe size | 12"[4] |
| Capacity | 52 MMcf/d (FERC project list)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Clarksville Gas and Water - Natural Gas Interconnect Pipeline Project is a pipeline project in Kentucky and Tennessee, operated by City of Clarksville, Tennessee. It runs 20.8 miles of 12" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Clarksville Gas and Water - Natural Gas Interconnect Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP14-101”. Federal Energy Regulatory Commission. 7 March 2014. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Environmental Assessment, Clarksville Natural Gas Interconnect Pipeline Project (CP14-101)”. Federal Energy Regulatory Commission. 27 June 2014. Retrieved 4 October 2026.
- “Order Issuing Certificate, City of Clarksville, Tennessee (CP14-101)”. Federal Energy Regulatory Commission. 9 October 2014. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.