Clover Valley Pipeline Project
From the ProvenHand pipeline wiki
Clover Valley Pipeline Project is a natural gas pipeline in Ohio, operated by National Gas & Oil Cooperative. Construction began in 2025. It runs 4.9 miles of 12" pipe.
| Clover Valley Pipeline Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Ohio[2] |
| Counties | Licking[1] |
| Construction started | August 2025[1] |
| Ohio Power Siting Board case | 25-0444-GA-BLN[2] |
| Technical information | |
| Length | 4.9 mi[1] |
| Pipe size | 12"[1] |
| On ProvenHand | |
| Hands listed | 0 |
Clover Valley Pipeline Project is a natural gas pipeline in Ohio, operated by National Gas & Oil Cooperative. Construction began in 2025. It runs 4.9 miles of 12" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Clover Valley Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Clover Valley Pipeline Project (The Energy Cooperative project page)”. The Energy Cooperative (National Gas & Oil Cooperative). Retrieved 3 October 2026.
- “PUCO Docketing Information System: gas cases, purpose BLN”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.