Line 1360 Upgrade Project is a natural gas pipeline in Pennsylvania, operated by Columbia Gas Transmission, LLC. Construction began in 2009.
| Line 1360 Upgrade Project | |
|---|---|
| General information | |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Pennsylvania[1] |
| Counties | Washington[1] |
| Construction started | December 2009[3] |
| FERC docket | CP09-442[2] |
| On ProvenHand | |
| Hands listed | 0 |
Line 1360 Upgrade Project is a natural gas pipeline in Pennsylvania, operated by Columbia Gas Transmission, LLC. Construction began in 2009.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 1360 Upgrade Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Response to Data Request regarding the Line 1360 Upgrade Project (CP09-442)”. Columbia Gas Transmission, LLC (filed with FERC). 21 August 2009. Retrieved 4 October 2026.
- “FERC eLibrary docket CP09-442”. Federal Energy Regulatory Commission. 9 July 2009. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 1 for period ending December 13, 2009, Line 1360 Upgrade Project (CP09-442)”. Columbia Gas Transmission, LLC (filed with FERC). 17 December 2009. Retrieved 4 October 2026.