Columbia Gas Transmission CP15-150
From the ProvenHand pipeline wiki
Columbia Gas Transmission CP15-150 is a natural gas pipeline in Virginia and West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2017.
| Columbia Gas Transmission CP15-150 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| States | Virginia, West Virginia[3] |
| Counties | Virginia: Greene, Page, Rockingham, Shenandoah West Virginia: Hardy[3] |
| Approved | 24 March 2016[3] |
| In service | 8 August 2017[2] |
| FERC docket | CP15-150[1] |
| Technical information | |
| Cost | $34 million of estimated costs[3] |
| On ProvenHand | |
| Hands listed | 0 |
Columbia Gas Transmission CP15-150 is a natural gas pipeline in Virginia and West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2017.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Columbia Gas Transmission CP15-150? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP15-150”. Federal Energy Regulatory Commission. 2 April 2015. Retrieved 3 October 2026.
- “In-service notification and affirmative statement, Line WB2VA Integrity Project (CP15-150)”. Federal Energy Regulatory Commission (eLibrary filing). 14 August 2017. Retrieved 4 October 2026.
- “Order issuing certificate and granting abandonment, Columbia Gas Transmission, LLC (CP15-150)”. Federal Energy Regulatory Commission (eLibrary filing). 24 March 2016. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.