Line 138 Abandonment and Lateral Construction Project
From the ProvenHand pipeline wiki
Line 138 Abandonment and Lateral Construction Project is a pipeline lateral, operated by Columbia Gas Transmission, LLC. It entered service in 2017.
| Line 138 Abandonment and Lateral Construction Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[2] |
| Owner and operator | |
| Counties | Maryland: Garrett Pennsylvania: Fayette, Somerset[3] |
| Approved | 18 February 2016[4] |
| In service | 22 August 2017[2] |
| FERC docket | CP15-495[1] |
| Technical information | |
| Pipe size | 2"[3] |
| Cost | $47,400,000 (EA cost line; abandonment and lateral together; no dollar year given)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Line 138 Abandonment and Lateral Construction Project is a pipeline lateral, operated by Columbia Gas Transmission, LLC. It entered service in 2017.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 138 Abandonment and Lateral Construction Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP15-495”. Federal Energy Regulatory Commission. 20 May 2015. Retrieved 3 October 2026.
- “Notice of In-Service and Affirmative Statement, Line 138 Abandonment and Lateral Construction Project (CP15-495)”. Columbia Gas Transmission, LLC (filed with FERC). 24 August 2017. Retrieved 4 October 2026.
- “Environmental Assessment, Line 138 Abandonment and Lateral Construction Project (CP15-495)”. Federal Energy Regulatory Commission. 17 September 2015. Retrieved 4 October 2026.
- “Order Issuing Certificate and Approving Abandonment (CP15-495)”. Federal Energy Regulatory Commission. 18 February 2016. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.