Columbia Gas Transmission Line 1360 Replacement Project is a natural gas pipeline replacement in Pennsylvania, operated by Columbia Gas Transmission, LLC. Construction began in 2023. It runs 2.8 miles of 16" pipe.

Columbia Gas Transmission Line 1360 Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[1]
StatusIn service[2]
CommodityNatural gas[3]
Owner and operator
StatePennsylvania[3]
CountiesBeaver[3]
Construction startedMarch 2023[4]
FERC docketCP23-8[1]
Technical information
Length2.8 mi[3]
Pipe size16"[3]
Cost$18,000,000[3]
On ProvenHand
Hands listed0

Columbia Gas Transmission Line 1360 Replacement Project is a natural gas pipeline replacement in Pennsylvania, operated by Columbia Gas Transmission, LLC. Construction began in 2023. It runs 2.8 miles of 16" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Columbia Gas Transmission Line 1360 Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP23-8”. Federal Energy Regulatory Commission. 31 October 2022. Retrieved 3 October 2026.
  2. “Weekly Construction Status Report No. 42, final (Dec 2023), Line 1360 Replacement Project (CP23-8)”. Columbia Gas Transmission, LLC (filed with FERC). 27 December 2023. Retrieved 4 October 2026.
  3. “Environmental Assessment Report, Line 1360 Replacement Project (CP23-8)”. FERC. 9 January 2023. Retrieved 4 October 2026.
  4. “Weekly Construction Status Report No. 1 (March 2023), Line 1360 Replacement Project (CP23-8)”. Columbia Gas Transmission, LLC (filed with FERC). 14 March 2023. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.