Columbia Gas Transmission Line A-159 Project

From the ProvenHand pipeline wiki

Columbia Gas Transmission Line A-159 Project is a natural gas pipeline in Ohio, operated by Columbia Gas Transmission, LLC. Construction began in 2022. It runs 3.3 miles of 24" pipe.

Columbia Gas Transmission Line A-159 Project
Also calledLine A-159 Extension Project[1]
General information
KindPipeline project[2]
CommodityNatural gas[3]
Owner and operator
StateOhio[3][4]
CountiesGreene, Madison[3][4]
Construction startedMarch 2022[5]
FERC docketCP22-3[2]
Technical information
Length3.3 mi[4]
Pipe size24"[3][4]
Cost$27.3 million[3][4]
On ProvenHand
Hands listed0

Columbia Gas Transmission Line A-159 Project is a natural gas pipeline in Ohio, operated by Columbia Gas Transmission, LLC. Construction began in 2022. It runs 3.3 miles of 24" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Columbia Gas Transmission Line A-159 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Request for prior notice authorization pursuant to blanket certificate, Line A-159 Extension Project (CP22-3)”. Columbia Gas Transmission, LLC (filed with FERC). 4 October 2021. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP22-3”. Federal Energy Regulatory Commission. 4 October 2021. Retrieved 3 October 2026.
  3. “Notice of Request Under Blanket Authorization, Columbia Gas Transmission, LLC (CP22-3)”. Federal Energy Regulatory Commission. 15 October 2021. Retrieved 4 October 2026.
  4. “Environmental Assessment Report, Line A-159 Extension Project (CP22-3)”. FERC. 1 December 2021. Retrieved 4 October 2026.
  5. “Weekly Construction Status Report No. 001, Line A-159 Project (CP22-3)”. Columbia Gas Transmission, LLC (filed with FERC). 28 March 2022. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.