Columbia Gas Transmission SR538 Pipeline Replacement Project
From the ProvenHand pipeline wiki
Columbia Gas Transmission SR538 Pipeline Replacement Project is a natural gas pipeline replacement in Ohio, operated by Columbia Gas Transmission, LLC. Construction began in 2024.
| Columbia Gas Transmission SR538 Pipeline Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Ohio[3] |
| Counties | Hocking[3] |
| Construction started | 29 January 2024[4] |
| FERC docket | CP24-5[1] |
| Contractors | |
| Technical information | |
| Cost | $24,700,000[3] |
| On ProvenHand | |
| Hands listed | 0 |
Columbia Gas Transmission SR538 Pipeline Replacement Project is a natural gas pipeline replacement in Ohio, operated by Columbia Gas Transmission, LLC. Construction began in 2024.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Cogar Right Of Way Clearing, LLC[4] | Clearing and reclamation | Tree clearing mobilized and began 2024-01-29 per weekly construction status report 1 | from 29 January 2024 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Columbia Gas Transmission SR538 Pipeline Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP24-5”. Federal Energy Regulatory Commission. 13 October 2023. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 40 (Oct 28 to Nov 3, 2024), SR538 Pipeline Replacement Project (CP24-5)”. Columbia Gas Transmission, LLC (filed with FERC). 5 November 2024. Retrieved 4 October 2026.
- “Environmental Assessment Report, SR538 Pipeline Replacement Project (CP24-5)”. FERC. 22 December 2023. Retrieved 4 October 2026.
- “Weekly Construction Status Report No. 1 (Jan 29 to Feb 4, 2024), SR538 Pipeline Replacement Project (CP24-5)”. Columbia Gas Transmission, LLC (filed with FERC). 6 February 2024. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.