Columbia Gulf Transmission Mainline 1999 Project is a natural gas pipeline expansion, operated by Columbia Gulf Transmission, LLC. It entered service in 1999.

Columbia Gulf Transmission Mainline 1999 Project
Also calledCGT Mainline Expansion[1]
General information
KindPipeline project[2]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Owner and operator
StatesMS, TN[2] or KY, LA, MS, TN[1][sources disagree]
Approved10 February 1999[2]
In serviceNovember 1999[1]
FERC docketCP98-596[2]
Technical information
Pipe size30", 36"[1]
Capacity315.2 MMcf/d (FERC project list)[2] or 307 MMcf/d additional capacity (EIA)[1][sources disagree]
Cost$37.68 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Columbia Gulf Transmission Mainline 1999 Project is a natural gas pipeline expansion, operated by Columbia Gulf Transmission, LLC. It entered service in 1999.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 315.2 MMcf/d (FERC project list)[2]
  • 307 MMcf/d additional capacity (EIA)[1]
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Columbia Gulf Transmission Mainline 1999 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.