Columbia Gulf Transmission Mainline 300 Replacement Project is a natural gas pipeline replacement in Kentucky, operated by Columbia Gulf Transmission, LLC. It entered service in 2021. It runs 0.1 miles of 36" pipe.

Columbia Gulf Transmission Mainline 300 Replacement Project
Also calledMainline 300 Replacement Project[1]
General information
KindPipeline project[1]
Project typeReplacement[1][2]
StatusIn service[1][3]
CommodityNatural gas[1]
Operator
Owner and operator
StateKentucky[1]
CountiesMenifee, Montgomery[4]
Approved24 February 2021[4]
In service29 July 2021[1][3]
FERC docketCP20-490[1]
Technical information
Length0.1 mi[1]
Pipe size36"[1][4]
Cost$5.4 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Columbia Gulf Transmission Mainline 300 Replacement Project is a natural gas pipeline replacement in Kentucky, operated by Columbia Gulf Transmission, LLC. It entered service in 2021. It runs 0.1 miles of 36" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Columbia Gulf Transmission Mainline 300 Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP20-490”. Federal Energy Regulatory Commission. 30 June 2020. Retrieved 3 October 2026.
  3. “Notice of Commencement of Service, Mainline 300 Replacement Project (CP20-490)”. Columbia Gulf Transmission, LLC (filed with FERC). 9 August 2021. Retrieved 4 October 2026.
  4. “Order Granting Certificate and Approving Abandonment, Columbia Gulf Transmission, LLC (CP20-490)”. Federal Energy Regulatory Commission. 24 February 2021. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.