Columbia Pipeline East Side Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Columbia Pipeline East Side Expansion Project is a natural gas pipeline expansion in New Jersey, operated by Columbia Pipeline. Construction began in 2015. It runs 19 miles of 20" pipe.

Columbia Pipeline East Side Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StateNew Jersey[1]
CountiesNew Jersey: Gloucester
Pennsylvania: Chester, Pike
[2]
Construction started2015[3]
In service30 October 2015[1] or 2 October 2015[2][sources disagree]
FERC docketCP14-17[1]
FERC pre-filing docketPF13-7[1]
Technical information
Length19 mi[1]
Pipe size20"[1]
Capacity312 MMcf/d additional capacity (EIA)[1]
Cost$269 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Columbia Pipeline East Side Expansion Project is a natural gas pipeline expansion in New Jersey, operated by Columbia Pipeline. Construction began in 2015. It runs 19 miles of 20" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 30 October 2015[1]
  • 2 October 2015[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Columbia Pipeline East Side Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Columbia Pipeline Group's East Side Expansion Project Placed In Service”. Columbia Pipeline Group, Inc. (PR Newswire release). 2 October 2015. Retrieved 3 October 2026.
  3. “Columbia's ESE project placed in service”. World Pipelines. 5 October 2015. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.