Columbia Pipeline East Side Expansion Project
From the ProvenHand pipeline wiki
Columbia Pipeline East Side Expansion Project is a natural gas pipeline expansion in New Jersey, operated by Columbia Pipeline. Construction began in 2015. It runs 19 miles of 20" pipe.
| Columbia Pipeline East Side Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | New Jersey[1] |
| Counties | New Jersey: Gloucester Pennsylvania: Chester, Pike[2] |
| Construction started | 2015[3] |
| In service | 30 October 2015[1] or 2 October 2015[2][sources disagree] |
| FERC docket | CP14-17[1] |
| FERC pre-filing docket | PF13-7[1] |
| Technical information | |
| Length | 19 mi[1] |
| Pipe size | 20"[1] |
| Capacity | 312 MMcf/d additional capacity (EIA)[1] |
| Cost | $269 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Columbia Pipeline East Side Expansion Project is a natural gas pipeline expansion in New Jersey, operated by Columbia Pipeline. Construction began in 2015. It runs 19 miles of 20" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Columbia Pipeline East Side Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Columbia Pipeline Group's East Side Expansion Project Placed In Service”. Columbia Pipeline Group, Inc. (PR Newswire release). 2 October 2015. Retrieved 3 October 2026.
- “Columbia's ESE project placed in service”. World Pipelines. 5 October 2015. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.