Line 1278-Line K Replacement Project is a natural gas pipeline replacement in New York and Pennsylvania, operated by Columbia Gas Transmission, LLC. Construction began in 2011.
| Line 1278-Line K Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | New York, Pennsylvania[2] |
| Counties | New York: Orange Pennsylvania: Pike[2] |
| Approved | 17 March 2011[3] |
| Construction started | 17 May 2011[4] |
| FERC docket | CP10-492[1] |
| FERC pre-filing docket | PF10-6[1] |
| Technical information | |
| Pipe size | 20"[2] |
| Cost | $53,378,666 actual (final cost report; estimate $56,756,300)[5] |
| On ProvenHand | |
| Hands listed | 0 |
Line 1278-Line K Replacement Project is a natural gas pipeline replacement in New York and Pennsylvania, operated by Columbia Gas Transmission, LLC. Construction began in 2011.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 1278-Line K Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP10-492”. Federal Energy Regulatory Commission. 26 August 2010. Retrieved 3 October 2026.
- “Application to replace and abandon facilities on Line 1278 and Line K, Pike County PA and Orange County NY (CP10-492)”. Columbia Gas Transmission, LLC (filed with FERC). 26 August 2010. Retrieved 4 October 2026.
- “Order issuing certificate and approving abandonment, Columbia Gas Transmission (CP10-492)”. FERC. 17 March 2011. Retrieved 4 October 2026.
- “Report of start of construction, Line 1278-Line K Replacement Project (CP10-492)”. Columbia Gas Transmission, LLC (filed with FERC). 26 May 2011. Retrieved 4 October 2026.
- “Final Cost Report, Line 1278/Line K Replacement Project (CP10-492)”. Columbia Gas Transmission, LLC (filed with FERC). 1 March 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.