Barr Engineering Co.
From the ProvenHand pipeline wiki
Barr Engineering Co. is a third-party inspection firm.
| Barr Engineering Co. | |
|---|---|
| General information | |
| Industry | |
| On ProvenHand | |
| Hands listed | 0 |
Barr Engineering Co. is a third-party inspection firm.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
Inspection
| Project | Project built |
|---|---|
| 10" North System Pipeline Relocation - Cass County[1] | 2021 |
| 8" NGL & 20" Residue Gas Pipelines - Williams Cnty[2] | 2020 |
References
- “As-Built Inspection Report, case PU-20-381, docket 66”. Barr (filed with the North Dakota Public Service Commission). 15 September 2022. Retrieved 3 October 2026.
- “As-Built Inspection Report, case PU-20-247, docket 58”. Barr (filed with the North Dakota Public Service Commission). 11 January 2021. Retrieved 3 October 2026.