Enbridge Pipelines (east Texas) L.p.
From the ProvenHand pipeline wiki
Enbridge Pipelines (east Texas) L.p. is a pipeline owner-operator.
| Enbridge Pipelines (east Texas) L.p. | |
|---|---|
| General information | |
| Industry | |
| Successor |
|
| Earlier PHMSA operator ID | 31613[1] |
| On ProvenHand | |
| Hands listed | 0 |
Enbridge Pipelines (east Texas) L.p. is a pipeline owner-operator.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As owner or operator
| Project | Role | Status |
|---|---|---|
| DC 36-inch Goodrich to Kountz Pipeline Project[4] | Owner and operator | |
| Orange Compressor Station Project[3] | Owner and operator | |
| TETCO STX Lateral[2] | Owner and operator | Approved |
References
- “PHMSA annual report data: annual hazardous liquid 2010 present”. Pipeline and Hazardous Materials Safety Administration. Archived from the original on 8 May 2026. Retrieved 3 October 2026.
- “FERC eLibrary docket CP18-517”. Federal Energy Regulatory Commission. 5 July 2018. Retrieved 3 October 2026.
- “FERC eLibrary docket CP10-317”. Federal Energy Regulatory Commission. 30 April 2010. Retrieved 3 October 2026.
- “FERC eLibrary docket CP07-72”. Federal Energy Regulatory Commission. 29 January 2007. Retrieved 3 October 2026.