Compressor Station 70 Horsepower Replacement
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Compressor Station 70 Horsepower Replacement is a natural gas facility project in Mississippi, operated by Transcontinental Gas Pipe Line Company, LLC.
| Compressor Station 70 Horsepower Replacement | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Replacement[2] or Rebuild[1][sources disagree] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Mississippi[1] |
| Counties | Walthall[1] |
| FERC docket | CP09-80[2] |
| On ProvenHand | |
| Hands listed | 0 |
Compressor Station 70 Horsepower Replacement is a natural gas facility project in Mississippi, operated by Transcontinental Gas Pipe Line Company, LLC.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Compressor Station 70 Horsepower Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Advance notification under 18 CFR 2.55(b), Compressor Station 70 Horsepower Replacement, Transcontinental Gas Pipe Line Company, LLC (CP09-80)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 12 March 2009. Retrieved 4 October 2026.
- “FERC eLibrary docket CP09-80”. Federal Energy Regulatory Commission. 12 March 2009. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.