Compressor Station 80 Replacement
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Compressor Station 80 Replacement is a natural gas pipeline replacement in Mississippi, operated by Transcontinental Gas Pipe Line Company, LLC.
| Compressor Station 80 Replacement | |
|---|---|
| General information | |
| Kind | Pipeline project[1] or Facility project[1][sources disagree] |
| Project type | Replacement[2] |
| Status | Approved[1] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Mississippi[1] |
| Counties | Jones[1] |
| FERC docket | CP23-96[2] |
| Technical information | |
| Units added | 2 × Solar Titan 250S (gas turbine)[1] |
| Cost | $136,435,608[1] |
| On ProvenHand | |
| Hands listed | 0 |
Compressor Station 80 Replacement is a natural gas pipeline replacement in Mississippi, operated by Transcontinental Gas Pipe Line Company, LLC.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Compressor Station 80 Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, Compressor Station 80 replacement (CP23-96)”. FERC. 17 April 2023. Retrieved 4 October 2026.
- “FERC eLibrary docket CP23-96”. Federal Energy Regulatory Commission. 16 March 2023. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.