Concord-Tilton Expansion Phase 1&2a
From the ProvenHand pipeline wiki
Concord-Tilton Expansion Phase 1&2a is a natural gas pipeline expansion in New Hampshire, operated by KeySpan Energy Delivery Inc. It entered service in 2004. It runs 7 miles of 12" pipe.
| Concord-Tilton Expansion Phase 1&2a | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | New Hampshire[1] |
| In service | 10 November 2004[1] |
| Technical information | |
| Length | 7 mi[1] |
| Pipe size | 12"[1] |
| Capacity | 50 MMcf/d additional capacity (EIA)[1] |
| Cost | $3.87 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Concord-Tilton Expansion Phase 1&2a is a natural gas pipeline expansion in New Hampshire, operated by KeySpan Energy Delivery Inc. It entered service in 2004. It runs 7 miles of 12" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Concord-Tilton Expansion Phase 1&2a? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.