Concord-Tilton Expansion Phase 1&2a is a natural gas pipeline expansion in New Hampshire, operated by KeySpan Energy Delivery Inc. It entered service in 2004. It runs 7 miles of 12" pipe.

Concord-Tilton Expansion Phase 1&2a
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StateNew Hampshire[1]
In service10 November 2004[1]
Technical information
Length7 mi[1]
Pipe size12"[1]
Capacity50 MMcf/d additional capacity (EIA)[1]
Cost$3.87 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Concord-Tilton Expansion Phase 1&2a is a natural gas pipeline expansion in New Hampshire, operated by KeySpan Energy Delivery Inc. It entered service in 2004. It runs 7 miles of 12" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Concord-Tilton Expansion Phase 1&2a? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.